Dekalb Energy Canada Ltd.
Garrington, Alberta
Gas Plants

This facility was destroyed by fire. The following complete EPCM services were provided.

A temporary by-pass system was installed to enable the sweet natural gas plant to supply Nova (accomplished in three weeks). The main process building was completely rebuilt; the damage to the compressor buildings was repaired, as well as the field office. Plant capacity rated at 14.5 MMSCF/D (accomplished in five weeks). This work included metallurgical analysis and hydro-test for damaged equipment to the satisfaction of the Boilers' Branch, confirmation of process design, generation of all field construction isometric, PLC programming, start-up and commissioning.

Click on a thumbnail below to view picture:

Before Construction
   
 
During Construction
   
 
After Construction


<< Back to Project Summaries Main

Sign up for our newsletter
Sign-up for the Cub Engineering Newsletter

Enter your Name:

Enter your Company Name:

Enter your E-mail address:
 

To unsubscribe from this newsletter, click here.


Professional Affiliations

A.P.E.G.G.A.
A.P.E.G.S.
A.P.E.G.B.C.