Cub Engineering Ltd.
Home About Cub Engineering Engineering Services Projects Engineering Resources Contact Us
PROJECT SUMMARIES

EnCana Corporation
Ft. McMurray, Alberta
Pipeline systems

An environment/pipeline inspector was provided for the 4" and 6" pipeline system gathering project at Tar/Birch and Ell's (NW of Fort McMurray). The scope included operation and regulatory support for the utilization of native work crews to assist with watercourse crossings (isolation method) and debris disposal. Ensuring cleanup and reclamation measures (i.e. rollback and seeding) were met adhering to the conditions in Letter(s) of Authority, both Provincial and Federal.

<< Back to Project Summaries Main

Sign up for our newsletter
Sign-up for the Cub Engineering Newsletter

Enter your Name:

Enter your Company Name:

Enter your E-mail address:
 

To unsubscribe from this newsletter, click here.


Professional Affiliations

A.P.E.G.G.A.
A.P.E.G.S.
A.P.E.G.B.C.