Excel Energy Inc. Complete EPCM services were provided, which included start-up and commissioning, for the expansion of the Ardmore Compressor Station. Phase I expansion of the Ardmore Compressor Station increased design capacity by 5 MMSCFD gas which included the installation of a 200 HP reciprocating compressor, a metering building, 1700 m of 4" gathering system pipeline, and 600 m of 4" sales pipeline. Design emphasis was on flexibility for expansion with the most cost efficient solution. Phase II expansion of the Ardmore Compressor Station included installation of a dual inlet separator skid, 400 BBL produced water tank, office building, the tie-in of two wells, and the installation of 1500 m of 4" gathering system pipeline. Modification was also done to the compressor exhaust silencers to bring the facility into accordance with AEUB noise directives. Click on a thumbnail below to view picture: