Cub Engineering Ltd.
Home About Cub Engineering Engineering Services Projects Engineering Resources Contact Us
PROJECT SUMMARIES

New Cache Petroleums Ltd.
Pouce Coupe, Alberta
Pipeline Systems, Wellsite Facilities

Complete EPCM services were provided for the installation of a wellsite choke heater and approximately 4 kms of steel and polyethylene pipelines. Design capacity equaled 5.6 103m3/d. Included was the installation of a flare stack and modifications to the existing header system, electrical, control and instrumentation design, and start-up and commissioning. Facility design emphasized expandability and reliability, and included allowance for future addition of a second well.

Click on a thumbnail below to view picture:



<< Back to Project Summaries Main

Sign up for our newsletter
Sign-up for the Cub Engineering Newsletter

Enter your Name:

Enter your Company Name:

Enter your E-mail address:
 

To unsubscribe from this newsletter, click here.


Professional Affiliations

A.P.E.G.G.A.
A.P.E.G.S.
A.P.E.G.B.C.